Step
1. Cylinder head is disassembled and parts are inspected. We Soda Blast
cylinder head and valves.
Step
2. Valve guides are checked to factory specifications. If they are out of
specification they are removed
Step
3. Valve stem diameter are measured and valve length is measure and recorded
Step
4. Valve protrusion is measured and recorded
Step
5. Head is installed on NEWEN machine and both intake and exhaust seat
profiles are designed
Intake profile
Exhaust profile
Step
6. This pictures shows valve job completed.
Step 7. Head is assembled to factory specfications